Actuarial topic · Property and casualty, and life insurance

Technical reserves

Technical reserves are an insurer's largest liability and its actuary's most scrutinized estimate. This guide explains which reserve covers each obligation, how IBNR is estimated with development triangles and how the best estimate plus risk margin required by the LISF is built.

10%
Cost of capital for the margin
6
Reserve types in the LISF
1972
Bornhuetter-Ferguson method
IntroductionThe reserve mapUnearned premium reserveOutstanding obligationsChain-ladderBornhuetter-FergusonVariabilityBest estimate plusCalculatorWorked exampleIn MexicoCommon mistakesFAQFurther reading
01

Introduction

An insurer collects today and pays later. Between collecting the premium and making the last payment on a claim, days may pass in auto insurance, or decades in a life annuity or a liability claim. Technical reserves are the estimate, in present value, of everything still to be paid on contracts already written. If they are understated, reported profit and solvency are fictitious; if they are overstated, capital is tied up and pricing is distorted.

The Mexican framework, in force since 2015 under the Ley de Instituciones de Seguros y de Fianzas (LISF, Insurance and Surety Institutions Law) and the Circular Única de Seguros y Fianzas (CUSF, Single Insurance and Surety Circular), adopted the economic approach of Solvency II: the reserve is the best estimate of future cash flows discounted with risk free curves plus a risk margin calculated on a cost of capital basis. Each company develops its own estimation methods, but they must be registered with the CNSF (National Insurance and Surety Commission) and comply with actuarial standards of practice.

This page focuses on short term reserves and on estimating incurred claims, which is where actuarial judgment carries the most weight. Life mathematical reserves are covered in Actuarial mathematics, and a quick chain-ladder calculation is available in the Calculators.

02

The technical reserve map

Article 216 of the LISF lists the reserves that insurance companies must establish. Each responds to a different obligation or risk, and the distinction matters because they are calculated, invested and released differently. The first two, the unearned premium reserve and the reserve for outstanding obligations, are valued with company specific methods registered with the CNSF; the rest follow rules set by the Commission itself.

It helps to picture a timeline for each policy. Before the claim occurs, the obligation sits in the unearned premium reserve. Once it occurs, it moves to outstanding obligations, even if the insurer does not know about it yet: that is IBNR. Catastrophe and contingency reserves do not relate to specific policies but to possible deviations in aggregate claims experience.

Unearned premium (unexpired risk). Expected value of future obligations for the unexpired term: claims, benefits, guaranteed values, dividends, and acquisition and administrative expenses.
Outstanding obligations. Incurred claims pending payment, matured policies, dividends, incurred but not reported claims (SONR, the Mexican term for IBNR) and allocated loss adjustment expenses.
Special mathematical reserve. Social security pensions only: a provision for improvements in pensioners' life expectancy.
Investment fluctuation. Social security pensions only: cushions long term variations in asset returns.
Contingency. Social security pensions and mutual insurers: covers statistical deviations in claims experience.
Catastrophic risks. Agricultural and livestock, credit, surety (caución), mortgage credit, financial guarantee, earthquake and hurricane lines: covers the probable maximum loss from extreme events.
03

Unearned premium reserve

In its traditional accounting form, the unearned premium reserve for an annual policy is simply the unearned premium: if an annual premium was collected and four months have elapsed, eight twelfths are reserved. That approach assumes the premium is adequate and that risk is spread evenly over the term. Under the LISF, the reserve is the best estimate of future claims and expenses for the remaining term, plus the risk margin. If the rate is inadequate, the best estimate exceeds the unearned premium and the loss is recognized immediately, which is precisely the point.

For short term insurance, the best estimate is usually obtained by applying to the unearned premium an expected ultimate loss ratio, derived from development triangles by origin year, plus administrative and adjustment expenses. For long term insurance (whole life, endowments, multiyear medical expense) cash flows are projected policy by policy using mortality, morbidity, lapse and expense assumptions, and discounted with the risk free curve published by the CNSF. The CUSF includes in this reserve premiums written in advance whose coverage has not yet started.

Seasonality and the distribution of risk over the term matter: a rain fed crop policy or a hurricane policy does not accumulate risk evenly throughout the year. Prorating the premium linearly in those cases releases reserve before the risk has passed.

Best estimate
\[BEL=\sum_{t\ge 1}\frac{E[\,S_t+G_t-P_t\,]}{(1+r_t)^{t}}\]

St are claims and benefits, Gt expenses and Pt future contractual premiums in period t, all gross of reinsurance; rt is the risk free spot rate for term t.

04

Outstanding obligations and SONR

Once a claim has occurred, the obligation has three layers. The first is the case reserve the adjuster sets for each known claim. The second is the deficiency in those case reserves: reported claims tend to grow (or shrink) over their life because of new information, litigation or inflation; in the English language literature this is called IBNER. The third is claims that have already occurred but the insurer does not yet know about, pure IBNR. In Mexico, the LISF groups the last two under siniestros ocurridos y no reportados (SONR, incurred but not reported claims), together with allocated loss adjustment expenses.

Loss adjustment expenses are split into allocated (fees of lawyers, experts and external adjusters attributable to a claim) and unallocated (the cost of the internal claims department). The former are estimated with the same triangles as the claims or with their own triangles; the latter, with expense ratios to paid and outstanding claims.

The basic input is the development triangle: rows by origin year (accident, underwriting or report year), columns by development age and cells with cumulative paid or incurred amounts. The consistency of the triangle matters more than the method: changes in case reserving policy, in payment speed or in the treatment of salvage break the patterns and make any technique fail.

Decomposition of ultimate losses
\[U_i=\underbrace{P_i}_{\text{paid}}+\underbrace{R_i}_{\text{case}}+IBNR_i,\qquad OPC_i=R_i+IBNR_i\]

For origin year i, ultimate loss Ui is the amount paid plus the case reserve plus IBNR (which includes the deficiency in case reserves). The reserve for outstanding obligations is the unpaid portion.

05

Chain-ladder: the development method

The chain-ladder assumes that each origin year will develop in the future with the same average factors observed in the past. Age to age factors are calculated as weighted ratios of consecutive columns, multiplied together to obtain the cumulative development factors to ultimate (CDF) and applied to the latest diagonal. Its great advantage is that it relies solely on the company's own experience and requires no a priori loss assumption.

Its weakness shows up in the most recent years: with a CDF of 1.6 or 3, any random deviation in the first diagonal is amplified. A large claim reported early inflates the projected ultimate; a year with slow reporting depresses it. It is also sensitive to the tail: if the triangle does not reach full development, a tail factor is needed, fitted with curves (exponential, inverse power) or with market information.

Development factors and ultimate loss
\[\hat f_j=\frac{\sum_{i}C_{i,j+1}}{\sum_{i}C_{i,j}},\qquad CDF_j=\prod_{k\ge j}\hat f_k,\qquad \hat U_i=C_{i,n_i}\,CDF_{n_i}\]

Ci,j is the cumulative amount for origin year i at development age j; the sums run over the years that have both cells. ni is the latest observed age for year i, and IBNR is Ûi - Ci,ni.

06

Bornhuetter-Ferguson and Cape Cod

In 1972 Ronald Bornhuetter and Ronald Ferguson proposed estimating IBNR as the unreported portion of an a priori expected loss. The unreported proportion, 1 - 1/CDF, comes from the development pattern; the level, from premium multiplied by an expected loss ratio (ELR) taken from the business plan, the technical note or mature years. As a result, IBNR does not depend on what has been reported to date, and an early large claim is not multiplied.

BF is equivalent to a credibility weighted average of the chain-ladder and the expected loss ratio method, with weight Z = 1/CDF on the chain-ladder: the more mature the year, the more credibility given to experience. The Benktander method iterates BF using the BF ultimate itself as the new a priori and lands halfway between the two. Its weak point is the ELR: if it is optimistic, BF under-reserves persistently.

The Cape Cod method (or Stanard-Bühlmann) removes the arbitrariness of the ELR by estimating it from the data itself: it divides reported claims for all years by used premium, that is, premium weighted by the reported proportion. That common ELR is then plugged into the BF formula. It works well when rates have been stable or when premiums are first adjusted to current rate and trend levels.

Bornhuetter-Ferguson IBNR
\[IBNR_i^{BF}=P_i\cdot ELR\cdot\left(1-\frac{1}{CDF_{n_i}}\right)\]

Pi is the earned premium for origin year i, ELR the expected loss ratio and 1 - 1/CDF the proportion of ultimate losses not yet reported.

Cape Cod ELR
\[ELR^{CC}=\frac{\sum_i C_{i,n_i}}{\sum_i P_i/CDF_{n_i}}\]

Reported claims divided by used premium. The denominator weights each year's premium by the fraction of its losses already known.

07

Variability: Mack and bootstrap

A point estimate of the reserve says nothing about how wrong it could be. In 1993 Thomas Mack showed that the chain-ladder is the estimator of a distribution free model in which the conditional expectation of Ci,j+1 is fj·Ci,j and its variance is proportional to Ci,j. With that model he derived closed form expressions for the mean squared error of prediction of IBNR, which combines process error (future randomness) and estimation error (uncertainty in the factors).

The bootstrap on the over-dispersed Poisson model, popularized by England and Verrall, resamples the Pearson residuals of the incremental triangle, rebuilds thousands of pseudo observed triangles, re-estimates the factors and simulates future payments. The result is a full distribution of IBNR, from which percentiles are taken for the risk margin, economic capital or the IFRS 17 risk adjustment. In both cases, the estimated variability is only as good as the stability of the triangle: it does not capture regime changes.

Mack variance parameter
\[\hat\sigma_j^{2}=\frac{1}{n-j-1}\sum_{i=1}^{n-j}C_{i,j}\left(\frac{C_{i,j+1}}{C_{i,j}}-\hat f_j\right)^{2}\]

It measures the dispersion of the individual factors around the weighted factor. It feeds the standard error of IBNR by origin year and in total.

08

Best estimate plus risk margin

Article 218 of the LISF provides that technical reserves equal the sum of the best estimate and a risk margin, calculated separately. The best estimate is the probability weighted mean of future cash flows, discounted with market risk free curves, on a gross basis and taking into account all policyholder options. The risk margin is what a third party would require, on top of the best estimate, to take over the obligations.

The margin is calculated as the cost of holding, over the life of the obligations, the own funds backing their solvency capital requirement (RCS). The CUSF sets a 10% net cost of capital rate, the same for all companies, and describes how to allocate the RCS by line of business. The projection of the future RCS is usually approximated with a pattern proportional to the remaining best estimate, which gives long tailed lines proportionally larger margins.

Cost of capital risk margin
\[MR=CoC\sum_{t\ge 0}\frac{RCS_t}{(1+r_{t+1})^{t+1}},\qquad CoC=10\%\]

RCSt is the projected capital requirement attributable to the obligations at the start of year t, rt+1 the risk free rate and CoC the net cost of capital rate set by the CUSF.

09

Interactive calculator

Lab

IBNR: Bornhuetter-Ferguson versus chain-ladder

For an immature accident year, compare the incurred but not reported reserve produced by each method. BF anchors the undeveloped portion to the expected loss; chain-ladder projects it from what has been observed.

·
Unreported proportion 1 − 1/CDF
·
Bornhuetter-Ferguson IBNR
·
BF ultimate
·
BF ultimate loss ratio
·
Chain-ladder IBNR
·
Chain-ladder ultimate
·
CL ultimate loss ratio
·
Weight on observed experience Z = 1/CDF

10

Worked example: IBNR by chain-ladder, Bornhuetter-Ferguson and Cape Cod

A property and casualty insurer has the following triangle of cumulative incurred claims, in millions of pesos, by accident year and development age in months. 2021: 60, 84, 93, 96 (12, 24, 36 and 48 months). 2022: 66, 91, 101. 2023: 70, 98. 2024: 88. Earned premiums are 150, 160, 170 and 180 million. Year 2021 is considered fully developed (tail factor 1.00). The business plan ELR is 65%. In 2024 a large claim was reported early, which makes its first diagonal (88) unusually high.

  1. Weighted age to age factors: 12 to 24 months, (84 + 91 + 98)/(60 + 66 + 70) = 273/196 = 1.3929; 24 to 36 months, (93 + 101)/(84 + 91) = 194/175 = 1.1086; 36 to 48 months, 96/93 = 1.0323.
  2. Cumulative factors to ultimate: at 36 months, 1.0323; at 24 months, 1.1086 × 1.0323 = 1.1443; at 12 months, 1.3929 × 1.1443 = 1.5939. The unreported proportions 1 - 1/CDF are 3.13%, 12.61% and 37.26%.
  3. Chain-ladder: 2022 ultimate = 101 × 1.0323 = 104.26; 2023 = 98 × 1.1443 = 112.14; 2024 = 88 × 1.5939 = 140.26. IBNR is 3.26 + 14.14 + 52.26 = 69.66 million, and the 2024 ultimate loss ratio comes out at 77.9%, well above the other years (64% to 66%).
  4. Bornhuetter-Ferguson: expected losses = premium × 65% = 104.0, 110.5 and 117.0. IBNR = 104.0 × 0.0313 = 3.25; 110.5 × 0.1261 = 13.94; 117.0 × 0.3726 = 43.59. Total 60.78 million. The 2024 ultimate is 88 + 43.59 = 131.59, a loss ratio of 73.1%: the large claim is recognized in full, but it is not multiplied by 1.59.
  5. Cape Cod: used premium = 150/1 + 160/1.0323 + 170/1.1443 + 180/1.5939 = 566.49; reported claims = 96 + 101 + 98 + 88 = 383. ELR = 383/566.49 = 67.61%. With that ELR total IBNR is 63.22 million (45.34 for 2024), between BF and chain-ladder because the data, including the large claim, push up the estimated ELR.
  6. Illustrative risk margin: if the RCS attributable to this reserve were 12, 7, 3 and 1 million at the start of each of the next four years, with a flat risk free rate of 9%, RM = 0.10 × (12/1.09 + 7/1.092 + 3/1.093 + 1/1.094) = 0.10 × (11.01 + 5.89 + 2.32 + 0.71) = 1.99 million, which is added to the discounted best estimate.
Lesson: The three methods agree on the mature years and differ on the most recent one, where the chain-ladder amplifies the noise in the first diagonal. The 8.9 million difference between chain-ladder and BF is an actuarial decision that must be justified with information about the large claim, not by a preference for the lower number.
11

Technical reserves in Mexico

Articles 216 to 219 of the LISF define the reserves, their purpose and their valuation principles, and require the actuarial methods for the unearned premium reserve and the reserve for outstanding obligations to be registered with the CNSF. Title 5 of the CUSF develops the regime: Chapter 5.1 governs the unearned premium reserve, 5.2 outstanding obligations, 5.3 the statutory method the Commission assigns when a company's method does not adequately reflect its obligations, 5.4 the risk margin, 5.5 the registration of methods and 5.6 catastrophe reserves. Triangles are classified by origin and development year under Annex 5.3.2, and the actuarial standards of practice for reserving are in Annex 4.3.1-b.

Earthquake reserves and hurricane and other hydrometeorological risk reserves are cumulative: they increase every month with the earned portion of retained risk premiums, calculated with the technical models in Annexes 5.1.5-a and 5.1.6-a, plus investment income at the 28 day Cetes rate, and they have a ceiling linked to the retained probable maximum loss. The agricultural and livestock reserve increases with 35% of the earned retained gross premium; the credit and surety (caución) reserves, with 75% of the annual excess of earned retained risk premium over retained claims. Drawing on them requires authorization from the Commission, except in automatic cases.

Reserve adequacy is the subject of an annual independent actuarial opinion, subject to the standard in Annex 23.3.1 of the CUSF, and each company's actuarial function must express a view on methodology and assumptions. International groups that report to their parent under IFRS 17 calculate, in parallel, a risk adjustment for non-financial risk using an approach that does not necessarily match the regulatory risk margin.

LISF, article 216

Lists the reserves: unearned premium, outstanding obligations, special mathematical, investment fluctuation, contingency, catastrophic risks and any others the CNSF determines.

LISF, article 218

Reserve = best estimate + risk margin; discounting with risk free curves, gross cash flows, inflation, policyholder options and periodic comparison against experience.

LISF, article 219

Requirement to register with the CNSF the actuarial methods for the unearned premium reserve and the reserve for outstanding obligations.

CUSF, Chapter 5.4

Sets the 10% net cost of capital rate for the risk margin and the procedure for allocating the RCS by line of business.

CUSF, Chapter 5.6

Establishment, increase, ceiling and release of catastrophic risk reserves by line of business.

CUSF, Annex 23.3.1

Actuarial standard of practice for the opinion on the condition and adequacy of technical reserves.

12

Common mistakes

Applying chain-ladder to the latest year without review

A high CDF turns any deviation in the first diagonal into a large error. Cross check with BF or Cape Cod and analyze large claims separately.

Mixing triangles that span policy changes

If payment speed, case reserving practice or business mix changed, the historical factors no longer describe the future. Adjust the data (Berquist-Sherman) or segment before projecting.

Using an optimistic ELR in BF

BF inherits the bias of the a priori. If the ELR comes from the sales plan rather than from trended experience, IBNR falls short year after year; compare with Cape Cod and with the ultimates of mature years.

Forgetting loss adjustment expenses and salvage

Claims IBNR without allocated loss adjustment expenses understates the obligation, and projecting gross amounts of salvage and recoveries without treating them separately distorts the factors.

13

Frequently asked questions

What is the difference between IBNR and SONR?
They are the same concept: incurred but not reported claims. In practice, the term covers both unknown claims and the deficiency in reserves for claims already reported. The LISF adds allocated loss adjustment expenses to this reserve.
When should paid triangles be used, and when incurred?
Paid triangles do not depend on adjusters' judgment but take longer to develop; incurred triangles mature sooner but inherit changes in case reserving policy. The recommended practice is to project with both and explain the differences.
Why does the risk margin use a 10% cost of capital?
Because the LISF requires the rate to be the same for all companies, and the CUSF sets it at 10%. It represents the return above the risk free rate that an investor would require to hold the capital backing the obligations until they run off.
Are catastrophe reserves released if there is no earthquake?
No. They are cumulative and can only be drawn on in the cases set out in the CUSF, such as payment of retained catastrophe claims. Once they reach their ceiling, linked to the retained probable maximum loss, increasing them is no longer mandatory.
What does the CNSF do if the registered method is not adequate?
It grants a period to correct it and, if the company fails to do so, assigns it a statutory method with market parameters while it regularizes its situation, under Chapter 5.3 of the CUSF.
14

Further reading

PreviousInsurance pricingNextRisk theory and ruin theory