Actuarial topic · P&C reserving

IBNR methods

IBNR is the part of the reserve estimated before the claim has been seen. This guide covers the data, factor and tail selection, the deterministic and stochastic methods the profession uses, how to choose among them and how to validate them, with an interactive tool that compares five methods on the same triangle.

5
Methods in the tool
1972
Bornhuetter-Ferguson
1993
Mack standard error
What it estimatesDataFactors and tailDeterministicStochasticMachine learningComparison toolChoosingValidationIn MexicoToolsReadingsFAQFurther reading
01

What IBNR estimates

At any balance sheet date an insurer owes claims it does not yet know about. A collision on December 30 is reported in January; a professional liability suit can arrive years after the act that caused it. On top of those come the development of claims already reported, whose case reserves move as information arrives. IBNR (incurred but not reported) estimates both: pure IBNR and the deficiency in case reserves, known in the literature as IBNER.

In Mexico, the LISF groups this concept into the reserve for claims incurred but not reported (SONR), part of the reserve for outstanding obligations, together with allocated loss adjustment expenses. The legal framework, the LISF articles and the CUSF chapters are covered in the technical reserves guide; this page focuses on methods.

No method is right on its own. Professional practice, as set out in the Friedland text that the CAS distributes free of charge, is to project with several methods, understand why they differ and select an estimate with documented judgment.

02

The data: triangles and diagnostics

The input is the development triangle. Rows are origin periods: accident year (most common in P&C), underwriting year (useful in reinsurance and when coverage extends over time) or report year (for claims-made policies). Columns are development ages and cells hold cumulative amounts: paid, incurred (paid plus case reserves) or counts of reported and closed claims.

Before projecting, review diagnostics that reveal operational changes: the paid-to-incurred ratio by age (if it rises along recent diagonals, payments are faster or case reserves weaker), claim closure rates, the average case reserve per open claim adjusted for inflation, and average severity. A shift along a diagonal rather than a row points to an internal change (systems, reserving policy, adjusters) rather than to the risk itself.

Homogeneity matters too: separate lines and coverages with different patterns, isolate large or catastrophe losses that distort factors, decide whether to work gross or net of reinsurance, and treat salvage and recoveries consistently. A well built triangle is worth more than a sophisticated method.

03

Factor and tail selection

With the triangle ready, compute individual age-to-age factors and choose an average for each column. The volume weighted average is the chain ladder estimator and gives more weight to large years; the simple average treats every year equally; the medial average drops the high and low to limit outliers; averages of the latest three or five years respond to recent changes at the cost of more volatility. The final selection is usually a judgment informed by all of them.

When the triangle does not reach full development, a tail factor is needed. Richard Sherman proposed in 1984 fitting the inverse power curve, in which the excess of the factor over one decays as a power of age; exponential decay gives shorter tails. Other options are the incurred-to-paid ratio at the most mature age, industry benchmarks or Clark's growth curves. The tail can be a material share of the reserve in liability and workers' compensation.

Inverse power curve and tail factor
\[f_j-1=a\,j^{-b},\qquad f_{\text{tail}}=\prod_{j>n}\left(1+a\,j^{-b}\right)\]

Parameters a and b are estimated by linear regression of ln(fj - 1) on ln(j) using the observed factors above one. For exponential decay, the regression is on j instead of ln(j).

04

Deterministic methods

The classic methods differ in how much they trust observed experience versus an a priori expectation. From least to most weight on reported losses: expected loss ratio, Cape Cod and Bornhuetter-Ferguson, Benktander and chain ladder.

Development

Paid and incurred chain ladder

Projects each year with the average observed factors. It relies only on the company's own experience but amplifies noise in recent years, where the cumulative factor is high.

\[\hat U_i=C_{i,n_i}\,CDF_{n_i}\]

Suited to short-tailed, stable lines and to mature years of any line.

A priori

Expected loss ratio (ELR)

The ultimate is premium times an expected loss ratio taken from the plan, the pricing basis or mature years adjusted for rate and trend. It ignores reported losses.

\[\hat U_i=P_i\cdot ELR\]

Useful for very immature years, new lines or sparse data.

Credibility

Bornhuetter-Ferguson

Adds reported losses to the unreported share of expected losses. It is equivalent to weighting chain ladder by 1/CDF and the ELR by the rest.

\[IBNR_i=P_i\cdot ELR\left(1-\tfrac{1}{CDF_{n_i}}\right)\]

The standard for recent years of long-tailed lines, provided the ELR can be defended.

Iterated credibility

Benktander (Hovinen)

Applies BF a second time, using the BF ultimate as the new a priori. It sits between BF and chain ladder, with weight 1 - (1 - 1/CDF)² on experience; Mack analyzed it in ASTIN Bulletin in 2000.

\[IBNR_i^{GB}=\left(1-\tfrac{1}{CDF_{n_i}}\right)\left(C_{i,n_i}+IBNR_i^{BF}\right)\]

A good alternative when BF looks too rigid and chain ladder too volatile.

Estimated a priori

Cape Cod (Stanard-Bühlmann)

Estimates a common ELR from the data, dividing reported losses by used-up premium, and applies it with the BF formula.

\[ELR^{CC}=\frac{\sum_i C_{i,n_i}}{\sum_i P_i/CDF_{n_i}}\]

Requires premiums restated to current rate and trend levels; otherwise it mixes incomparable years.

Counts and costs

Frequency-severity

Projects ultimate claim counts (from count triangles) and ultimate severity, trended to each year's level, separately. It separates the volume effect from the cost effect.

\[\hat U_i=\hat N_i\cdot\hat X_i\]

Very useful when limits or cost inflation change, as in medical expense and auto.

Data adjustment

Berquist-Sherman

Before projecting, restates the triangle to the current level of case reserve adequacy or settlement speed. It is not a projection method but a data correction that restores consistency.

Essential when diagnostics show changes in reserving policy or claims operations.

Paid and incurred

Munich Chain Ladder

Published by Quarg and Mack in 2004 to narrow the gap between paid and incurred projections: it adjusts each year's factors according to its paid-to-incurred ratio relative to the average.

Recommended when paid and incurred projections diverge systematically.

05

Stochastic methods

A point estimate says nothing about how wrong it might be. Stochastic models quantify uncertainty, which the LISF requires to be reflected in the risk margin and the capital requirement, and IFRS 17 in the risk adjustment for non-financial risk.

Distribution free

Mack model

Thomas Mack showed in 1993 that chain ladder is optimal under a model with conditional mean fjCi,j and variance proportional to Ci,j, and derived the mean squared error of prediction by year and in total.

\[\hat\sigma_j^{2}=\frac{1}{n-j-1}\sum_{i}C_{i,j}\left(\frac{C_{i,j+1}}{C_{i,j}}-\hat f_j\right)^{2}\]

Gives a standard error, not a full distribution. It powers the tool on this page.

GLM

Over-dispersed Poisson and bootstrap

Renshaw and Verrall showed in 1998 that an over-dispersed Poisson GLM with origin and development effects reproduces chain ladder reserves. England and Verrall popularized in 2002 the bootstrap of its residuals to obtain the full IBNR distribution.

\[\ln \mu_{ij}=c+\alpha_i+\beta_j,\quad \operatorname{Var}(X_{ij})=\phi\,\mu_{ij}\]

Standard for economic capital percentiles, risk margins and the IFRS 17 risk adjustment.

Growth curves

Clark's method

David Clark proposed in 2003 fitting a growth curve (loglogistic or Weibull) to the reporting pattern by maximum likelihood, in LDF and Cape Cod versions. It handles the tail and interpolation with few parameters.

\[G(x)=\frac{x^{\omega}}{x^{\omega}+\theta^{\omega}}\]

Useful with small triangles or irregular valuation dates.

Bayesian

Bayesian MCMC models

Glenn Meyers tested Bayesian models on the CAS loss reserve database in his 2015 monograph and showed that chain ladder understates variability; he proposed models with correlation between years and a trend in development.

They let expert judgment enter explicitly as a prior distribution.

06

Claim-level reserving and machine learning

Triangles aggregate and lose information: the injury type, attorney, region or adjuster on each claim. Individual claim models project each claim from its own features. Mario Wüthrich published in 2018, in the Scandinavian Actuarial Journal, a regression tree approach to individual claims reserving, and Kevin Kuo presented DeepTriangle in 2019, a recurrent neural network trained on many industry triangles at once.

These methods promise more accuracy when data is rich and stable, but they require model governance, explainability for regulators and auditors, and validation against classic methods. In practice they coexist: machine learning helps to segment, detect shifts or estimate large losses, and the triangle remains the common language. More context in the article on predictive analytics in reserving and in Actuar.IA.

07

Interactive comparison

Lab

IBNR method comparison

Edit the triangle of cumulative incurred losses (millions of Mexican pesos, accident years 2020 to 2025 valued at year-end 2025) and the earned premiums. The tool computes factors, the tail and the IBNR reserve under chain ladder, expected loss ratio, Bornhuetter-Ferguson, Benktander and Cape Cod, plus the Mack standard error.

12 mo24 mo36 mo48 mo60 mo72 moEarned premium
2020
2021
2022
2023
2024
2025

08

Choosing a method

The choice depends on maturity, data stability and available information. This matrix summarizes common practice; in every case run at least two methods and explain the difference.

SituationPreferred methodsWhy
Mature years, short-tailed linePaid and incurred chain ladderRemaining factors are close to one and experience is credible.
Recent years, long-tailed lineBF, Benktander, Cape CodThey avoid amplifying noise in the first diagonal.
New line or no historyExpected loss ratio with market dataThere is no own pattern; the a priori is the best information.
Changes in case reservesBerquist-Sherman, paid chain ladderIncurred data is no longer consistent across diagonals.
Cost inflation or changing limitsFrequency-severitySeparates volume and cost and allows severity trending.
Paid and incurred divergeMunich Chain LadderReconciles both projections through the paid-to-incurred ratio.
Capital, risk margin, IFRS 17Mack, ODP bootstrap, BayesianThey give a standard error or distribution, not just a point.
09

Validation and monitoring

Actual versus expected

Compare each quarter's development with what the selected factors implied. Persistent deviations of the same sign signal bias, not bad luck.

Retrospective testing

Remove the latest diagonals, re-estimate and compare with what actually happened. It is the most direct way to learn which method works for your portfolio.

Paid and incurred reconciliation

If the two triangles lead to different ultimates, the explanation usually lies in the diagnostics: payment speed or case reserve adequacy.

Documented sensitivity

Show how much the reserve moves with the tail, the ELR or the removal of a large loss. It is the first thing the appointed actuary and the actuarial function review.

10

IBNR in Mexico

Under the LISF, IBNR is part of the reserve for outstanding obligations and is valued as a best estimate plus a risk margin. Article 219 requires the actuarial method for this reserve to be registered with the CNSF; Title 5 of the CUSF governs its constitution, method registration and the statutory method the Commission assigns when a company's own method does not adequately reflect its obligations, and Annex 5.3.2 classifies triangles by origin and development year. Adequacy is reviewed in the annual actuarial opinion under Annex 23.3.1.

Companies reporting to a parent under IFRS 17 also estimate the liability for incurred claims with their own risk adjustment for non-financial risk. Each provision, with links to the CUSF, is covered in technical reserves in Mexico and in IFRS 17.

11

Open source tools

Two free libraries implement nearly everything described here. In R, the ChainLadder package includes chain ladder, Mack, Munich Chain Ladder, bootstrap and Clark models. In Python, chainladder-python, maintained under the CAS organization, follows a scikit-learn style interface and reproduces the examples from the Friedland text. More resources in actuarial science in R and Python.

12

Key readings and journals

The founding IBNR papers appeared in actuarial journals that are still active: the CAS Proceedings and Variance, the IAA's ASTIN Bulletin, the British Actuarial Journal and the Scandinavian Actuarial Journal. See our directory of actuarial journals for recent issues, the essential books library and the guide to where to buy actuarial books.

13

Frequently asked questions

What is the best IBNR method?
There is none. Chain ladder works well for mature years and stable lines; BF and Cape Cod for recent years of long-tailed lines; the expected loss ratio method when there is no history. Practice is to compare several and justify the selection.
Why does chain ladder fail in the latest year?
Because its cumulative factor is high: any random deviation in the first diagonal is multiplied. A large claim reported early can inflate that year's ultimate by the same factor.
What is IBNER?
It is the deficiency, or redundancy, in case reserves on claims already reported. Together with pure IBNR it forms the broad IBNR estimated from incurred triangles; in Mexico both fall within the SONR reserve.
How is the Bornhuetter-Ferguson ELR chosen?
From the pricing basis, the business plan or the loss ratios of mature years brought to current rate and trend levels. Cape Cod estimates it from the data itself and is a useful check.
Does the Mack standard error include the tail?
Not in its original form; Mack published an extension in 1999 that adds a tail factor. The tool on this page shows the error without tail uncertainty, so read it as a lower bound.
14

Further reading

PreviousTechnical reservesNextRisk and ruin theory